24/7 News Market
No Result
View All Result
Friday, April 3, 2026
  • Breaking News
  • International
  • Lifestyle
  • Moda & Beauty
  • Most Read
  • Politics
  • Society
  • Sports
Contacts
24/7 News Market
No Result
View All Result

Home » Cleared Area Certification Ceremony for the 400 KV Power Transmission Route from Huambo to Lubango

Cleared Area Certification Ceremony for the 400 KV Power Transmission Route from Huambo to Lubango

in Most Read
Reading Time: 2 mins read

On June 7, 2024, a ceremony took place in the province of Huíla, specifically in Lubango, to officially hand over the certificate for the de-mined area along the 400 KV electricity transmission line between Huambo and Lubango.

The event was attended by key figures, including the Minister of Energy and Water, João Baptista Borges, the Minister of National Defense, Former Combatants, and Veterans of the Homeland, João Ernesto dos Santos Liberdade, the Secretary of State for Energy, Arlindo Carlos, the Vice-Governors of Huíla and Huambo, the representative of the African Development Bank for Angola and São Tomé, along with various officials from both ministries and other invited guests.

Following the handover of the certificate, Minister João Ernesto dos Santos Liberdade expressed his appreciation to the Ministry of Energy and Water for their efforts in making the occasion possible, and shared his thoughts on the broader significance of the event.

Minister João Baptista Borges then took the floor, acknowledging the contributions of Minister João Ernesto dos Santos Liberdade, which were key to the ceremony’s success. He underscored the vital importance of de-mining in advancing the project.

He went on to stress that the primary goal is to enhance energy capacity to meet the needs of the region. The Minister praised the de-mining efforts, highlighting their crucial role in ensuring the success of various electrification projects across the country.

Additionally, João Baptista Borges noted that the project connecting Huambo to Lubango would create numerous jobs for young people, a point he deemed highly significant.

A symbolic presentation of a vehicle to the de-mining team on-site was also part of the event.

It is noteworthy that the construction of the 400 kV electricity transmission line between Huambo and Lubango will be executed in two sections, covering a total of 343 km.

Tags: João Baptista Borges

Most popular

Jerry Jones Makes Double Roster Decision for Christian Parker After Cowboys Fail to Land Nakobe Dean

by 24/7 News Market
March 10, 2026
0

Just a day ago, many reports suggested that Jerry Jones was eyeing a move for Philadelphia Eagles linebacker Nakobe Dean....

Read more

Crying cat kept following RSPCA officer to woman’s front door – inside was a desperately sad scene

Crying cat kept following RSPCA officer to woman’s front door – inside was a desperately sad scene
by 24/7 News Market
March 12, 2026
0

Shakira Perry left two French bulldogs alone without food and water for a number of days

Read more

Miami Standout Rejected Nick Saban’s Offer After Unexpected Counsel From High School Janitor

by 24/7 News Market
March 4, 2026
0

Back in high school, Rueben Bain Jr. was basically a human wrecking ball at Miami Central. The 8th DL/EDGE from...

Read more

INFORMATION ABOUT US

  • Contacts
  • Privacy Policy
  • Copyright

Chet Hanks is stranded in Colombia and wants the internet to help: “Free me”

Lou Holtz’s Death: How Every College Football Figure Mourned Notre Dame Legend

Monty Don opens up on making ‘regretful’ change at home after issue ‘got out of hand’

Monty Don opens up on making ‘regretful’ change at home after issue ‘got out of hand’

April 3, 2026
24/7 News Market

No Result
View All Result
  • Breaking News
  • International
  • Lifestyle
  • Moda & Beauty
  • Most Read
  • Politics
  • Society
  • Sports